Honeywell Q7055C Series Installation Instructions Manual Download Page 7

Q7055C BUILDING NETWORK ADAPTERS BNA-1C/2CS

7

95-7735

OPERATION

Location of Parts and Controls

Refer to Figures 11 and 12 and the following descriptions for 
the location and function of parts and controls.

Fig. 11. Parts and controls on front side of BNA.

1—RESET

Hardware reset button. Located directly behind the small hole 
in the front panel. To reach this button, a pointed object like a 
sharp pen or an unfolded paper clip is necessary. Pressing 
this button resets the BNA device immediately. This operation 
is similar to applying power to the BNA device. The sequence 
of operations following the RESET is similar to Power on BNA 
device.

2—POWER

Power indicator. This LED lights up when power is connected 
to the BNA device.

3—HEARTBEAT

System Heartbeat display consists of two LEDs, one Red and 
one Green. During BNA system startup when BIOS is running, 
both LEDs flash continuously. When BNA Bootloader starts to 
run, the Red LED starts to flash. When the application 
firmware begins to run, the Green LED starts flashing.

4—CH1

Bus Channel 1 activity display. This display contains two 
green LEDs; one showing the BNA receive activity (Rx), and 
the other showing the BNA transmit activity (Tx).

5—CH2

Bus Channel 2 activity display. This display contains two 
green LEDs; one showing the BNA receive activity (Rx), and 
the other showing the BNA transmit activity (Tx).

NOTE:

Ch2 indication is only available on two channel 
devices. It is not available on the BNA-1C.

6—MODE

Mode switch button. This button is used to change the 
operating modes. For a detailed description about BNA 
operation modes, refer to the Operating Modes section of 
form no. 74-4047, Q7055C Building Network Adapter BNA-
1C/2CS Checkout & Test.

7—LAN

Local Area Network (LAN) activity display. Shows the actual 
LAN traffic status using three LEDs:

10LNK

. Ethernet speed of 10 mbps indicator (Green). If 

this LED is lit, then the Ethernet link is operating at 10 
mbps.

100LNK

. Ethernet speed of 100 mbps indicator (Green). If 

this LED is lit, then the Ethernet link is operating at 100 
mbps.

Activity

. Link activity indicator (Green) will blink if there is 

any activity (transmission/reception) on the LAN.

Fig. 12. Parts and controls on rear side of BNA.

8—CH2

2-pin connector for field bus channel 2 connection, electrically 
isolated, meets EMC and FCC requirements.

Field Bus wiring is described in the Field Bus Connection 
(Ch1/Ch2) section.

NOTE:

The Ch2 field bus connector is only available on two-
channel devices. It is not available on the BNA-1C.

9—CH1/CH2 BUS TERMINATION SWITCHES

These switches are used to select field bus termination and 
biasing. For a detailed description of the bus termination 
switch positions, refer to the Bus Termination Switch section 
of form no. 74-4047, Q7055C Building Network Adapter BNA-
1C/2CS Checkout & Test.

NOTE:

The Bus Termination Switch option near the Ch2 
field bus connector is only available on BNA-2CS 
two-channel devices. It is not available on the BNA-
1C.

10—CH1

2-pin connector for field bus channel 1 connection, electrically 
isolated, meets EMC and FCC requirements. Field Bus wiring 
is described in the Field Bus Connection (Ch1/Ch2) section.

11—AC/DC IN 24V

Power connector for 24 VAC (50 Hz to 60 Hz) or 24 VDC 
power supplies and chassis ground

. An external power 

supply is required. See the Power Connection section of this 
document for details.

12—RS-232

9-pin SUB-D male RS-232 connector, electrically isolated, PC 
pin compatible, protected against spikes. This interface is 
used for initial device setup and requires a standard Null-
Modem cable when interfacing to a PC.

BUILDING NETWORK ADAPTER M

ODEL

 2CS

Reset 

10 100 ACT 

M22563A 

Rx Tx 

Ch 2

Ch 1

Mode 

Boot NML 

Rx Tx 

LAN 

Power 

Ch1

A(+) B(-)

Ch2

A(+) B(-)

AC/DC IN

24V

10

9

8

13

12

11

BNA-2CS

normal

M25116

normal

10/100

+

-

Summary of Contents for Q7055C Series

Page 1: ...n to provide a seamless communication to the requesting device Status information such as LAN communication activity field bus traffic communication and system Heartbeat of the BNA is indicated by LEDs on the front of the device The BNA models provide an interface from various Honeywell controller buses that use RS 485 signals to a local area network using 802 3 Ethernet protocol This allows data ...

Page 2: ... product has been received without dam age 2 Verify that the correct BNA device has been delivered 3 Check the package contents The following items are included in each product package Building Network Adapter device 50017367 001 Power Supply Building Network Adapter Installation Instructions Bag of installation materials as follows one 3 pole Phoenix power connector one or two Phoenix con troller...

Page 3: ...x Tx 100 Boot NML M25115 Place the BNA adapter with the topside down on the desk Remove the four feet from the bottom of the BNA by pushing horizontally away from the housing with a flat screwdriver Push the four inserts included fully and horizontally into the housing Adjust the four retaining clips included on top of the inserts Fasten the retaining clips with the included four screws Use the ho...

Page 4: ...ICLE 760 ALL POWER LIMITED WIRING MUST BE SEPARATED FROM ALL NON POWER LIMITED WIRING BY A MINIMUM DISTANCE OF 1 4 IN 6 MM NOTE TYPICAL MOUNTING LOCATION FOR Q7055 BUILDING NETWORK ADAPTER BNA 1 G GROUNDING CONDUCTOR 2 GROUND CONNECTION 8 32 STUD WITH 8 32 KEPS NUT 3 GROUND CONNECTION FOR 14507678 SERIES ETHERNET PROTECTOR AND OTHER LOW VOLTAGE EQUIPMENT 4 DRILLED MOUNTING HOLES FOR 14507719 001 8...

Page 5: ...crew terminals wire a cable to the 24 V and GND terminals on the power supply 2 Strip the two power cable ends and insert each cable end into the openings of the 3 pole Phoenix connectors that are marked for power 3 Fasten them with a screwdriver 4 Connect a chassis ground to the third position on this connector as marked NOTE The polarity of the 3 pole Phoenix power con nector for DC power suppli...

Page 6: ...ct a BNA device to a LAN via an Ethernet Hub the required cable should be configured as shown in Fig 9 Fig 9 Straight through pinning for BNA to EthernetHub connections Connect BNA to Workstation When a BNA needs a direct connection to a workstation without using an Ethernet Hub a crossover cable is required Fig 10 shows how the different signals should be connected Fig 10 Crossover pinning for BN...

Page 7: ...atus using three LEDs 10LNK Ethernet speed of 10 mbps indicator Green If this LED is lit then the Ethernet link is operating at 10 mbps 100LNK Ethernet speed of 100 mbps indicator Green If this LED is lit then the Ethernet link is operating at 100 mbps Activity Link activity indicator Green will blink if there is any activity transmission reception on the LAN Fig 12 Parts and controls on rear side...

Page 8: ...ures and practices contained in applicable NFPA and UL standards The Q7055C BNA has no user replaceable fuses For service contact your local Honeywell Automation Control Solutions office as listed in the phone book or contact a regional office as shown at the end of this document Jameco IS A REGISTERED TRADEMARK OF ARNDT ELECTRONICS ELPAC IS A REGISTERED TRADEMARK OF JSR CORPORATION HONEYWELL EXCE...

Page 9: ...Q7055C BUILDING NETWORK ADAPTERS BNA 1C 2CS 9 95 7735 ...

Page 10: ...Honeywell Pacific Level 3 2 Richardson Place North Ryde NSW 2113 In North America Honeywell International Inc 1985 Douglas Drive North Golden Valley MN 55422 In Asia Zhang Jiang Hi Tech Park No 430 Li Bing Rd Pudong New Area Shangai 201203 China In Europe Middle East Africa India Hermes Plaza Hermeslaan 1H B 1831 Diegem Belgium www honeywell com buildingsolutions ...

Reviews: