Document 800-01529 Rev A
11
02/08
3.
Apply appropriate sealant around the opening to prevent moisture from entering the housing.
Figure 2
Base Gasket Opening
Connecting Cables Through the Side Conduit
1.
Peel back the bottom flat gasket below the side conduit just enough to expose the security
screw.
2.
Use the supplied Allen key to loosen and remove the security screw (see
3.
Use a flat screwdriver to unscrew the conduit plug.
4.
Pull the cables through the hole.
5.
Apply appropriate sealant around the opening to prevent moisture from entering the housing.
Base gasket opening
Summary of Contents for HD4DIR
Page 2: ...2 Revisions Issue Date Revisions A 02 08 New document ...
Page 4: ...4 ...
Page 6: ...6 ...
Page 8: ...8 ...