EKM-E ETHER-MON KEY DE-211
7
31-00160—01
DIP SWITCH PRE AND POST CONFIGURATION
IMPORTANT!
Before powering up the E10039 turn all 4 dip switches to Off (down postion).
Fig. 6.
1.
Plug the power supply in Ethernet Key. The Red PWR and Green Ready LED light should illuminate as shown below.
Fig. 7.
2.
Turn the middle two dip switches switch 2 & 3 on in the (up position).