
5
BLOCK DIAGRAM DKG 972
DKG 972
CIRCUIT AND TIMING DIAGRAM DKG 972
term. 8
term. 1
term. 9
blue
black
brown
IRD 1020.1
UVD 971
IRD- OR UVD CONNECTION
max. 10 A fast
6 A slow
Ph
IS
N
1
2
3
4
5
6
7
8
9
A
HS
ST
RT
EV
Z
V1
SA
Flame
amplifier
Reset
µ
C
Reset and
lock out
Power
supply
monitoring
1
3
4
5
6
7
8
9
A
rz
rv1
rv2
rs
RZ
RV1
RV2
RS
Fault display
Information
system
EEPROM
Oscillator
tw
tf
tvz tn ts
tv2
HS
Mains switch
GW
Gas proving switch
ST
Limit thermostat
RT
Control thermostat
EV
External reset and lock out button
IS
Ionisation probe
(IRD 1020.1, UVD 971see separate diagram)
Z
Ignition
V1
Solenoid valve, 1st-stage
V2
Solenoid valve, 2nd-stage
SA
External lock out signal
M
Auxiliary blower
tw
Waiting time
tf
Stray light monitoring
tvz
Pre-ignition time
tn
Post-ignition
ts
Safety time
tv2
2nd-stage delay
µ
C
Watchdog
Mains
monitoring
Power
supply
GW
V2
M