16
90DM4 User Manual
511105
Honeywell
2/07
I
ntroduction
Installation Instruc tions
7.
A ssem b le th e m etallic m ounting p late and th e p lastic b ase on th e
oc tog onal b ox with two 1/2" 8 /3 2 sh eet-m etal sc rews.
8 .
Install th e rub b er g ask et to seal th e m id d le op ening .
9.
C onnec t th e p ower and outp uts as sh own in th e W iring Details.
10. B efore m ounting th e c ov er of th e sam p ling unit b ox , start th e
v entilation feed ing fan and c h ec k if th ere is any air leak ag e. If
nec essary, seal with air p lug s.
11. P ress th e 90DM4 onto th e p lastic b ase (latc h es will c lic k ). F asten
th e sc rews at th e top of th e unit to loc k unit into p lac e.
Note: Vulcain uses ft/
minute velocity rules, however other industries or
companies use CFM: To convert from CFM to velocity (ft/
minute),
divide the flow by the area (Example: In a 2 ft x 4 ft duct, where
the area is 8 sq. ft
with a CFM of 30,000, the air velocity will be
30,000 cu. ft/
minute/(8 sq. f
t
) = 3,750 ft/
minute)