12.
INSTALLATION & INSTALLERS DETAILS - FOR HV PIV LOFT UNIT
Installation Address:
Installer’s Name:
Installation Company Name
and Address:
Tel:
Email:
Details of CPS Membership:
CPS Membership Number:
Installation Date:
COMMISSIONING & COMMISSIONING ENGINEERS DETAILS – FOR HV PIV LOFT UNIT
Installation Address:
Commissioning Engineer’s Name:
Commissioning Company Name
and Address:
Tel:
Email:
Details of CPS Membership:
CPS Membership Number:
Commissioning Date:
Ventilation Rate Set at VR1 (l/s):
Ventilation Rate Set at VR2 (l/s):
Method of Operation:
The Installer or Commissioning Engineer must explain to the home occupants how this unit ventilates their home, the method of operation above
and how the unit is serviced and maintained as described in the section which follows. The Installer or Commissioning Engineer should take a copy
of this completed document for their records and leave the full original completed document with the occupants for their future use and reference.
The Installer or Commissioning Engineer should confirm having actioned the aforementioned by ticking the relevant box below.
□ Installer
□
Commissioning Engineer