Connect communications cables 

Use standard CAT5/Ethernet cable to connect system communications in parallel. 

Link-A port on Master to Link-B on Slave 1, Link-A port on Slave 1 to Link-B on Slave 2, etc. 

 

 

Once master and slaves are connected, and once the master is connected (via communications) to 

inverter, power on all slaves. Set master inverter switch to detect # of systems in parallel: 

 

62 

OFF

  ON 

ON

 

ON 

ON 

ON

  Find Address: used when more 

than one system is connected 

 

Turn on Master Controller to detect total # of Stack’d systems. Master Controller will then display the # 

of systems in parallel. Once detected, turn Master off, change inverter switches on Master to match 

inverter of choice, and power back on.  

With all battery systems on and connected to BUS bars/inverter, flip inverter’s battery breaker to ON 

position. 

Complete 

Summary of Contents for Stack'd Series

Page 1: ...gh charge currents Use insulated tools Do not wear any metallic items such as watches bracelets etc In case of fire you must use a type D foam or CO2 fire extinguisher Do not open or dismantle the battery Electrolyte is very corrosive In normal working conditions you will not have any contact with the electrolyte If the battery casing is damaged do not touch the exposed electrolyte or powder becau...

Page 2: ...ject Do not power wash the battery or get wet Direct sunlight must be avoided Do not use a damaged battery Please contact the supplier within 24 hours if there is something abnormal Do not expose battery to flammable or harsh chemicals or vapors Do not paint any part of battery include any internal or external components Do not place any foreign objects into any part of battery The warranty will b...

Page 3: ...k Battery Modules Remove black sticker on bottom of battery Module Stack battery Module onto Base then remove both side covers per module Repeat with remaining modules Dial correct addresses on modules 1 8 with 1 being at the top and 8 being at the bottom ...

Page 4: ... OFF Set to the slave Pack 6 7 ON ON ON OFF OFF OFF Set to the slave Pack 7 8 OFF OFF OFF ON OFF OFF Set to the slave Pack 8 Turn on Modules Place Controller main BMS on top of system Make sure Controller is off Then remove top and side covers from Controller Install included BUS bars onto Controller terminals Connect power cables 4 0 to BUS bars and inverter Create comm cable for inverter communi...

Page 5: ...ct to Victron inverter Connect to the Growatt inverter Connect to the Sofar inverter Connect to the Solis inverter Connect to the Goodwe inverter Connect to the Sermatec inverter Connect to the Must inverter Connect to the GreenCell inverter ...

Page 6: ... Detect of modules in system Set all inverter switches on Controller Main BMS to On Power on Controller to detect modules Controller display will then show the of modules detected Power off Controller Detect Inverter Protocol Set inverter switches to correct inverter being used See chart below Power on Controller ...

Page 7: ... OFF ON ON OFF OFF OFF Victron_color_control 7 ON ON ON OFF OFF OFF SMA_LV 8 OFF OFF OFF ON OFF OFF Sermatec_LV 10 OFF ON OFF ON OFF OFF Growatt_SPF 11 ON ON OFF ON OFF OFF Li_PLUS 12 OFF OFF ON ON OFF OFF Schneider_Gateway 13 ON OFF ON ON OFF OFF SOL ARK_LV 18 OFF ON OFF OFF ON OFF Growatt_SPH SPA 27 ON ON OFF ON ON OFF GreenCell 29 ON OFF ON ON ON OFF Must 62 OFF ON ON ON ON ON Find Address used...

Page 8: ...ckets for the battery module into a long strip and mount them in the middle of the left hand side of the system Re install all covers on Modules and Controller from bottom to top Complete See next page for Parallel Installation ...

Page 9: ...ke effect See below for switch settings Address Coding Master Address Dial Code Switch Position Definition 1 2 3 4 5 6 1 ON OFF OFF OFF NG NG The host computer can monitor the operation of other systems by setting the main package 2 OFF ON OFF OFF NG NG Set to Pack2 3 ON ON OFF OFF NG NG Set to Pack3 4 OFF OFF ON OFF NG NG Set to Pack4 5 ON OFF ON OFF NG NG Set to Pack 5 6 OFF ON ON OFF NG NG Set ...

Page 10: ...master is connected via communications to inverter power on all slaves Set master inverter switch to detect of systems in parallel 62 OFF ON ON ON ON ON Find Address used when more than one system is connected Turn on Master Controller to detect total of Stack d systems Master Controller will then display the of systems in parallel Once detected turn Master off change inverter switches on Master t...

Reviews: