background image

- 2 -

1. Before assembling parts, please check the parts quantity according to 

the PARTS LIST.

2. Carefully unpack and spread out all parts in a large uncluttered area.

3. Familiarize yourself with all parts and compare them with the drawing 

below to make sure none are missing. Read all assembly instructions 

before beginning.

PARTS LIST

A) Keys

B) Locker Cabinet

C) 4 Leg Levelers

D) Hardware for Leg Levelers

E) Overhead Cabinet

F) Wall Cabinet

G) Mounting Hardware for Parts E & F

H) 4 Shelves

I) Bottom Back Cross bar

J) 2 Bottom Side Cross bars

K) 2 Front Legs (KL, KR)

L) 2 Back Legs (LL, LR)

M) 2 Large Triangles

N) 2 Small Triangles

O) 2 Top Cross Bars for Front & Back (OF, OB)

P) 2 Top Side Cross bars

Q) Drawer Mount Cross Piece

R) Drawer Assembly

S) Wood Top

T) Hardware Bag

U) 4 Wood Screws

Summary of Contents for GS00605204

Page 1: ...ans ou autour de l unit et garder les enfants loign s IL POURRAIT BASCULER 4 Lire toutes les directives et conseils de s curit avant d utiliser ce produit 5 Pour usage l int rieur seulement ADVERTENCI...

Page 2: ...sembly instructions before beginning PARTS LIST A Keys B Locker Cabinet C 4 Leg Levelers D Hardware for Leg Levelers E Overhead Cabinet F Wall Cabinet G Mounting Hardware for Parts E F H 4 Shelves I B...

Page 3: ...Install Leg Levelers using 16 bolts and 16 washers Part D MOUNTING YOUR WALL CABINET TO THE WALL 1 Open the doors to your unit and locate the 4 mounting holes 2 Align the mounting holes with two sixt...

Page 4: ...drawer mount cross piece Part Q to Part OF and Part OB using 2 Bolts Part T 8 Bolt Drawer Assembly Part R to frame using 4 bolts Part T 9 Bolt wood top Part S to the frame using 4 wood screws Part U...

Page 5: ...d buter LISTE DES PI CES A cl s B Cabinet casier C 4 patins r glables D Quincaillerie pour patins r glables E Cabinet de rangement sup rieur F Cabinet mural G Quincaillerie pour les pieces E et de F...

Page 6: ...n des patins r glables avec 16 boulons et 16 rondelles Pi ce D MONTAGE DE CABINET MURAL SUR LE MUR 1 Ouvrir les portes de l unit et rep rer les 4 trous de montage 2 Centrer les trous de montage avec d...

Page 7: ...ons pi ce T au total 7 Boulonner la pi ce transversale de montage de tiroir pi ce Q au cadre l aide de 2 boulons pi ce T 8 Boulonner le tiroir pi ce R au cadre l aide de 4 boulons pi ce T 9 Boulonner...

Page 8: ...les D Ferreter a para patines ajustables E Gabinete de colocaci n superior F Gabinete mural G Art culos de ferreter a de montaje para las piezas E y F H 4 tablas I Barra transversal posterior inferior...

Page 9: ...te posterior 2 Instalaci n de las patines ajustables con 16 pernos et 16 ruedecillas Pieza D MONTAJE DE LA GABINETE MURAL SOBRE LA PARED 1 Abrir las puertas de la unidad y localizar los 4 agujeros de...

Page 10: ...rra transversal de montaje del caj n Pieza Q al Pieza OF y Pieza OB usando 2 pernos Pieza T 8 Atornille el conjunto del caj n Pieza R al bastidor usando 4 pernos Pieza T 9 Atornille la barra superior...

Page 11: ...11 OF P KR J N M LR OB Q P KL M J N LL I 1 J 2 KL 1 KR 1 LL 1 LR 1 M 2 N 2 OF 1 OB 1 P 2 Q 1...

Page 12: ...garantie EL REGISTRO DEL PRODUCTO Gracias por adquirir este producto de calidad HOMAK Por favor tome el tiempo de registrar su c digo y su producto de empresa llamando a 1 800 874 6625 visitando www...

Reviews: