
OPERATION
HOLZMANN MASCHINEN GmbH www.holzmann-maschinen.at
14
MF7IN1
2. Umbau auf Arbeitsbühne und Plattform
W A R N I N G
Don’t use scaffold/platform
mode with legs fully
extended
1. Release all legs from locking position,
then rotate each pair of legs until you
can’t move them anymore. (see fig. 1-2)
W A R N I N G
Ensure that braces are
locked.
2. Pull the handle up until you can’t move
it any more, then release the tool tray
from its locking position, put the tool try
on the top of the handle, forming a
platform. (see fig. 3)
C A U T I O N
The loading capacity for the
tool tray is 2kg in this
mode.
3. Car creeper & Dolly mode
Put in the legs when using as in car
creeper / dolly or hand truck mode.
Dolly-Mode:
Connect a pulling rope to the towing
holes, then the dolly is completed.
4. Hand truck mode
1. Pull the handle up from the car creeper
mode until you can’t move it any more,
then a hand truck is ready.
2. Push the two buttons on the handle, it
can be retracted.
Elektrical Connection
3x Output 230V
ON / OFF-Switch
Input 230V
Summary of Contents for MF7IN1
Page 21: ......