Drilling machine

1 unit

MT5 arbor

1 unit

Spoke handle

3 units

Cooling system 5L

1 unit

MT3 drift

1 unit

4 mm hex wrench

1 unit

5 mm hex wrench

1 unit

6 mm hex wrench

1 unit

8 mm hex wrench

1 unit

10 mm hex wrench

1 unit

13 mm combination wrench

1 unit

Tool can

1 unit

Operator’s Manual

1 unit

The PRO 200-A ATEX is supplied 
including the following elements.

CONTENTS

1. 

GENERAL 

INFORMATION 

       4

 1.1. 

Application 

        5

 1.2. 

Technical 

data 

        5

 1.3. 

Design 

         6

2. 

STARTUP 

AND 

OPERATION 

       7

 

2.1. Disassembling the machine into parts 

 

 

 

 

7

 

2.2. Installing and removing the arbor, twist drill bit, or screw tap chuck  

8

 

2.3. Installing, removing, and operating the annular cutter 

 

 

10

 

2.4. Installing and removing the screw tap 

 

 

 

 

12

 2.5. 

Preparing         13

 2.6. 

Drilling 

         14

 2.7. 

Tapping 

         15

 2.8. 

Maintaining 

the 

air 

preparation 

unit 

     15

 2.9. 

Adjusting 

the 

gib 

clearance 

      16

3. 

ACCESSORIES 

         17

BEFORE YOU START WORK WITH THE MACHINE, PLEASE READ THESE 

INSTRUCTIONS CAREFULLY AND USE ALL RECOMMENDATIONS.

Summary of Contents for HMPRO200A

Page 1: ...MACHINE READS AND UNDERSTANDS ALL SAFETY AND OPERATING INSTRUCTIONS IN THIS MANUAL BEWARE OF ROTATING MACHINE PARTS LINE VOLTAGE PRESENT NEVER PLACE FINGERS NEAR CUTTING AREA OR MACHINE ARBOR HEARING...

Page 2: ...t which shall be the buyer s sole and exclusive remedy for defective goods ITMS accepts no additional liability pursuant to this guarantee for the costs of travelling or transportation of the product...

Page 3: ...elements CONTENTS 1 GENERAL INFORMATION 4 1 1 Application 5 1 2 Technical data 5 1 3 Design 6 2 STARTUP AND OPERATION 7 2 1 Disassembling the machine into parts 7 2 2 Installing and removing the arbo...

Page 4: ...ssive play on guide slides 8 Always wear safety goggles and ear protection 9 Do not remove metal chips with bare hands always use gloves 10 Do not touch the spindle and cutting tool during work 11 Cut...

Page 5: ...ces with a force that ensures operator safety and proper machine operation 1 2 Technical Data Pressure 6 5 bar 94 psi Air connection G1 2 external thread Power 3650 W Air consumption 3500 l min 125 CF...

Page 6: ...HMPRO200A OPERATOR S MANUAL 6 www holemaker com 1 3 Design K 1 4 6 2 4 8 4 1 1 4 B D...

Page 7: ...emaker com 7 2 START UP AND OPERATION 2 1 Disassembling the machine into parts Disconnect two quick couplings 1 Fig 2 use the 6 mm hex wrench to unscrew the drive 2 and then use the 5 mm and 10 mm hex...

Page 8: ...rbor twist drill bit screw tap chuck with axial compensation Next wear protective gloves and insert the arbor drill bit tap chuck into the spindle 2 Make sure that the vertical rod is not located betw...

Page 9: ...HMPRO200A OPERATOR S MANUAL www holemaker com 9 4...

Page 10: ...ctive gloves and then insert the proper pilot pin into the annular cutter 1 Fig 5 Use a clean and dry cloth to wipe the cutter Next place the cutter into the arbor 2 in such a way to align the flats 3...

Page 11: ...he spring As a result after the cutter goes through the entire thickness the slug core is expelled from the cutter When pressed the pilot pin also allows application of coolant to the inner surface of...

Page 12: ...g the screw tap Install the screw tap chuck with axial compensation as described before Next insert the entering tap tap no 1 into the proper adapter 1 Fig 8 and then install the adapter into the tap...

Page 13: ...com 13 2 5 Preparing Before beginning clean steel parts including the MT5 shank from anti corrosion coating used to preserve the machine for storage and transport Then use the transport lug 1 Fig 9 to...

Page 14: ...ast 20 mm 0 8 and 18 mm 0 7 for fittings The air source must be equipped with an air preparation unit a filter regulator and lubricator The flow capacity of the air preparation unit must not be less t...

Page 15: ...12 drops of oil per minute Use only oil whose ignition temperature exceeds 260 C 500 F If the machine is to be left idle for at least 24 hours after the work is finished increase the delivery of oil...

Page 16: ...e quality of drilled holes The clearance is inappropriate if the motor does not slide smoothly or if it raises without any action from the operator To adjust the clearance use the 13 mm combination wr...

Page 17: ...o tapping tooling QUICK CHANGE CHUCK MASTER HOLDER Quick change chuck master holder for use on vertical drilling and boring machines with right and left hand spindle rotation Used with quick change ad...

Page 18: ...M16 QASB3 M16 5 8 UNC UNF BSW 3 4 BSP 72 48 48 44 41 55 5 45 SPTH105 QASB3 M20 QASB3 M18 M20 3 4 UNC UNF BSW 72 48 48 44 41 55 5 45 SPTH105 QASB3 M22 QASB3 M22 7 8 UNC UNF BSW 1 2 BSP 72 48 48 44 41...

Page 19: ...rbon Nitride Coated Made In U S A M2 High Speed Steel Multi Cut Geometry 12 to 32mm Metric 25mm 50mm Stainless Steel Cast Iron Super Cut M42 Cobalt M42 High Speed Steel 8 Cobalt Titanium Nitride Coate...

Reviews: