Operating Instructions
153 146
197
C 9.92
Maintenance every 250 service hours
Checking the heating system for proper
operation
-
Refer to page 125.
Checking the air conditioner for proper
operation
-
Refer to the operating instructions for the air conditioner.
Checking the sight glass of the air condi-
tioner for the formation of bubbles
-
Refer to the operating instructions for the air conditio-
ner.
-
Check the air conditioner for proper operation.
-
Observe the sight glass (1) during operation. In case
of formation of bubbles, an air conditioning expert
must bleed the unit.
Bild_S 990_041
1
Summary of Contents for C 9.92 H
Page 1: ...Date of Issue 10 09 2009 Order No 153 146 OperatingInstructions C 9 92 H...
Page 2: ......
Page 6: ......
Page 17: ...Operating Instructions 153 146 15 C 9 92 Technical data Tractor dimensions Dimensional drawing...
Page 46: ......
Page 60: ......
Page 118: ......
Page 138: ......
Page 142: ......
Page 144: ......
Page 162: ......
Page 208: ......
Page 210: ......
Page 214: ......
Page 218: ......
Page 222: ......