
A S S E M B LY
I N S T R U C T I O N S
F R A M E A S S E M B L Y
Step 2d
FITNESS SYSTEMS
R
R
O
H
IST
8 - Arm Support Assembly
23 - Handle Assembly
24 - .5 Dia Shaft
Part Descriptions
CP - Pull-Pin to Chain Link Connecter
CX - 1/2” Oilite Bearing
CZ - 1/2” C-Clip
DA - Master Chain Link
Hardware Descriptions
2601 Assembly
Page 13
P
Attach (23) to (8), then (DA) to both (CP)
and (23). Hand tighten bolts only, they will be tightened later.
ress two (CX)’s into (23).
Summary of Contents for CL-2601
Page 4: ...FITNESS SYSTEMS R R O H IST 2601 Assembly Page 3 A S S E M B LY I N S T R U C T I O N S ...
Page 36: ...OW N E R S M A N U A L Page 35 2601 Assembly FITNESS SYSTEMS R R H T OIS ...
Page 39: ...OW N E R S M A N U A L 2601 Assembly Page 38 FITNESS SYSTEMS R R H T OIS ...
Page 41: ...FITNESS SYSTEMS R R H T OIS 2601 Assembly Page 40 OW N E R S M A N U A L ...
Page 47: ...FITNESS SYSTEMS R R H T OIS 2601 Assembly Page 46 OW N E R S M A N U A L ...
Page 50: ...FITNESS SYSTEMS R R H T OIS 2601 Assembly Page 49 OW N E R S M A N U A L ...