Operation
Hohner Maschinenbau GmbH
ECONOMY 25/40 02/2016
29
4.5
Exchanging the upper and lower knife
The upper and lower knives are subject to the heaviest stress and therefore wear
most quickly. The quality of the stitching depends to a large extent on the condi-
tion of these knives.
Blunt knives pinch the wire off obliquely and form burrs. This results in poor sta-
ple penetration and, in the case of pad stitching, the staples do not penetrate the
paper parallely, but run untrue in the paper.
- Fig. 4.5 -
- Remove finger guard -20-and former -21-.
- Turn the machine by hand, until the knives open.
- Unscrew cover -26-, remove knife holder with pressure slide -14- and unscrew fastening
screws -28- on upper knife -29- and fastening screws -30- on lower knife -31-.
Fitting the new knife is executed in the reverse order, ensuring correct seating of upper and lower
knives (cutting edges must converge exactly parallel).
- Mount the finger guard in the correct position and
note the markings
Before switching on the machine,
make sure that all protective devices are fit-
ted to the machine and all tools have been removed from the machine!
Quick stroke movements of the stitching heads!
Danger of crushing!
Before carrying out maintenance or repairs, take care that the power supply is switched off
and prevented from being switched on again accidentally.
Never operate the system without properly mounted finger guard.
TIP
Summary of Contents for ECONOMY 25/40
Page 2: ...2 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 4: ...4 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 12: ...Description of the ECONOMY 25 40 12 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH...
Page 24: ...Operation 24 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 3 18 18 18 18...
Page 26: ...Operation 26 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 4 38 18 37 39 42 41 8 36 35...
Page 28: ...Operation 28 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 5 20 26 29 28 14 21 31 30...
Page 32: ...Operation 32 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 7 21 46 50 49 45 47 48...
Page 34: ...Operation 34 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 8 Fig 4 9 43 43...
Page 40: ...Operation 40 ECONOMY 25 40 02 2016 Hohner Maschinenbau GmbH Fig 4 13...