STEP 2
6
Hodedah
www.hodedah.com
support @hodedah.com
H1
2
C
12
B
CB SCREW M3 X 12MM
2
HANDLE 2379 (160MM) - PVC
J1
I
DOOR SUPPORT SPRING
4
H2
P/H SCREW M4 X 24MM
902 MAGNET PLATE
4
2
12 x CB Screw M3.5 x 16mm (C). Tighten all the CB screw by using Pan head screw driver.
- Fix 2 x Handle 2379 (H1) to Panel (9) & (10) front side with 4 x P/H Screw M4 x 24mm (H2) using a
Philips head screwdriver.
- Fix 2 x Magnet plate (J1) to Panel (9) & (10) back with 2 x CB Screw M3 x 12mm (B) using a Philips
head screwdriver.
- Insert 4 x Door support spring (I) into top & bottom Panel (9) & (10) by push with thumb.
CB SCREW M3.5 X 16MM
I
9
BACK VIEW
10
B
J1
H2
H1
FRONT VIEW
10
9
9
BACK VIEW
10
M
C
O
O
M
12
O
GLASS (282 X 356 X 3MM)
2