![Hochiki America Corporation SPC-24 Installation Procedure Download Page 16](http://html1.mh-extra.com/html/hochiki-america-corporation/spc-24/spc-24_installation-procedure_2143525016.webp)
16
4. Terminal layout and part designation
4.1. Emitter
Figure 12 Emitter Construction
4.2. Receiver
Figure 13 Receiver Construction
Light Beam Adjustment
Screw (Horizontal)
Light Beam Adjustment
Screw (Vertical)
Operating Indicator
LED (Green)
Alignment Setting LED
(Green)
Emitter Wiring Terminals
Distance Setting Switches
SW1, SW2
E2
E2
E1
E1
Signal Strength LED (Red)
Light Beam Adjustment
Screw (Horizontal)
Light Beam Adjustment
Screw (Vertical)
Operating Indicator LED
(Green) and Fire Indicator
LED (Red)
Alignment Setting LED
(Green)
Receiver Wiring Terminals
Fault LED (Yellow)
Sensitivity Switches
SW1, SW2
Operation Setting Switches
SW3, SW4
Signal Strength LED (Yellow)
Push Switch
NC NC
T2
T1
F2
F2
F1
F1
0V
0V 24V 24V
Signal Strength LED (Green)