
www.hobex.at
5
/32
aDMInISTRaTIOn
2.1.
CONNECTION TEST
A connection test can be used to detect whether the connection can be set up between the
terminal and the data centre.
2. with
[F2]
select ”Administration“ (or press button
[2]
)
press
3. with
[F2]
select “Connection test“ (or press button
[0]
)
press
4. The terminal now carries out the connection test
5. Receipt is printed. If the text
„Resp: 007 Admin TX genehmigt“
can be seen on this, then the connection test was successful.
1. Press menu
[F4]