OM-494 Page 37
7-5.
Adjusting Engine Speed
Ref. 045 768-B
Engine speed is factory set and
should not require adjustment. Af-
ter tuning engine, check engine
speed with tachometer. See table
for proper no load speed. If neces-
sary, adjust speed as follows:
1
High Speed Stop Screw
2
Lock Nut
Loosen nut. Turn screw out (toward
front of engine) several turns.
3
Linkage
4
Lock Nuts
Loosen nuts. Start engine and
move linkage until engine runs at
weld/power speed. Tighten nuts.
Stop engine.
5
Speed Control Lever
Turn screw in until screw touches
lever. Tighten lock nut on screw.
Close side door.
3/8 in
1
3
2
4
Right Side
5
RPM
1850
Tools Needed:
Engine Speed
(No Load)
Weld/Power
7-6.
Servicing Optional Ether Starting Aid
ether2 7/96 – 153 382-A / Ref. 190 377 / S-0692
Stop engine.
Improper handling or expo-
sure to ether can harm your
health. Follow manufactur-
er’s safety instructions on
cylinder.
If engine does not start in cold
weather, check ether cylinder as
follows:
Remove cylinder from valve.
1
Ether Cylinder
2
Valve
3
Scale
Weigh cylinder to see if it is empty.
Be sure atomizer is not plugged and
valve fitting is clean.
Replace cylinder according to
Section 4-16.
1
2
15 oz
33 oz
(935 g)
(425 g)
3
Full
Empty
Summary of Contents for Hobart 300/300
Page 4: ......
Page 38: ...OM 494 Page 34 7 2 Maintenance Label ...
Page 49: ...OM 494 Page 45 Notes ...
Page 50: ...OM 494 Page 46 SECTION 8 ELECTRICAL DIAGRAMS Figure 8 1 Circuit Diagram For Welding Generator ...
Page 51: ...OM 494 Page 47 ST 192 298 F ...
Page 74: ...Notes ...