OM-926 Page 12
4-6. Connecting Work Clamp and Gas/Air Supply
1
Work Clamp
2
Workpiece
Connect work clamp to a clean,
paint-free location on workpiece, as
close to cutting area as possible.
.
Use only clean, dry air with 90
to 150 psi (620 to 1035 kPa)
pressure. Prevent moisture
from entering air supply at
extreme cold temperatures.
3
Gas/Air Inlet Opening
4
Hose
.
Hose must have a minimum
inside diameter of 3/8 in
(9.5 mm).
5
Teflon Tape
Obtain hose with 1/4 NPT right-
hand thread fitting. Wrap threads
with teflon tape (optional) or apply
pipe sealant, and install fitting in
opening. Route hose to gas/air
supply.
Or
Install supplied quick connect male
1/4 in NPT pipe fitting.
Connect female quick connect
fitting to pipe fitting.
Route hose to gas/air supply.
Y
Incorrect plasma gas can
cause torch and power
source damage. Use only air
or nitrogen for the plasma
gas.
Tools Needed:
5/8, 1-1/8 in
From Gas/Air Supply
Ref. 801 319-C / Ref. 803 221
Rear of Unit
1
2
5
3
4
Summary of Contents for AirForce 625
Page 4: ......
Page 31: ...OM 926 Page 27 SECTION 7 ELECTRICAL DIAGRAM 212 926 A Figure 7 1 Circuit Diagram ...
Page 37: ...Notes ...
Page 38: ...Notes ...