background image

  

 

 

 

 

 

© HMS Industrial Networks S.L.U - All rights reserved                

This information is subject to change without notice

 

 

  URL            https://www.intesis.com  

 
 

    Rev.1.1 

                1 / 2

 

 

INMBSRTR0320000 

Order Code:

 INMBSRTR0320000 

** stands for the Intesis gateway capacity and varies depending on the specific gateway acquired 

Installation Sheet rev.1.1 

HMS Industrial Networks S.L.U © 

 

SAFETY INSTRUCTIONS 

     

!

     

WARNING 

Follow  carefully  this  safety  and  installation  instructions. 
Improper work may lead to serious harmful for your health 
and may also damage seriously the Intesis gateway and/or 
any other equipment connected to it. 

 

The  Intesis  gateway  must  be  installed  by  accredited  electrician  or 
similar  technical  personnel,  following  all  the  safety  instructions  given 
here  and  in  accordance  always  with  the  country  legislation  for 
installation of electric equipment. 

 

The Intesis gateway cannot be installed outdoors or exposed to direct 
solar radiation, water, high relative humidity or dust. 

 

The  Intesis  gateway  must  only  be  installed  in  a  restricted  access 
location.  

 

In case of wall mount, fix firmly the Intesis gateway on a not vibrating 
surface following the instructions next. 

 

In case of DIN rail mount fix the Intesis gateway properly to the DIN rail 
following the instructions below.  

 

Mounting  on  DIN  rail  inside  a  metallic  cabinet  properly  connected  to 
earth is recommended. 

 

Disconnect  always  power  of  any  wires  before  manipulating  and 
connecting them to the Intesis gateway. 

 

A power supply with an NEC Class 2 or Limited Power Source (LPS) 
and SELV rated is to be used.  

 

Respect  always  the  expected  polarity  of  power  and  communication 
cables when connecting them to the Intesis gateway.  

 

Supply always a correct voltage to power Intesis gateway, see details 
of voltage range admitted by the device in the technical characteristics 
below.  

 

CAUTION:  The  device  is  to  be  connected  only  to  networks  without 
routing to the outside plant, all communication ports are considered for 
indoor only. 

 

This  device  was  designed  for  installation  in  an  enclosure.  To  avoid 
electrostatic  discharge  to  the  unit  in  environments  with  static  levels 
above 4 kV, precautions should be taken when the device is mounted 
outside  an  enclosure.  When  working  in  an  enclosure  (ex.  making 
adjustments,  setting  switches  etc.)  typical  anti-static  precautions 
should be observed before touching the unit. 

 

Safety instructions in other languages can be found at: 

https://intesis.com/docs/manuals/v6-safety

 

 

INSTALLATION 

Follow instructions next to properly install the Intesis gateway. 

 
Disconnect  from  mains  the  power  supply  before  connecting  it  to  the 
Intesis gateway. 

 

Disconnect  power  of  any  bus  or  communication  cable  before 
connecting it to the Intesis gateway. 

 

Mount the Intesis gateway in a vertical position on the wall or DIN rail 
following the instruction given below, respecting the safety instructions 
given above. 

 

IMPORTANT: 

Connect a NEC Class 2 or Limited Power Source (LPS) 

and  SELV  rated  power  supply  to  the  Intesis  gateway,  respect  the 
polarity  if  DC  power  or  Line  and  Neutral  if  AC  power. 

This  power 

supply  must  not  be  shared  with  other  devices. 

Apply  always  a 

voltage within the range admitted by the Intesis gateway and of enough 
power (see technical characteristics). 

 

Circuit-breaker must  be  used  before  the  power  supply.  Rating  250V-
6A. 

 

Connect the communication cables to the Intesis gateway, see details 
on the user's manual. 

 

Power the Intesis gateway and the rest of devices connected to it. 

Wall Mount 

1.  Separate  the  fixing  clips  in  the  bottom  of  the  box,  pushing 

them to the outside until hear the "click" which  indicates that 
now the clips are in position for wall mount, see in the figure 
below. 

2.  Use  the  holes  of  the  clips  to  fix  the  box  in  the  wall  using 

screws. Use the template below for the wall wholes. 
 

 

 

 

 

 
 

 Clips in their original position       Clips in position for wall mount 

    (for DIN rail mount) 

 

DIN Rail Mount 

With the clips of the box in their original position, insert first the box 
in the upper edge of the DIN rail and later insert the box in the down 
part of the rail, using a small screwdriver and following the steps in 
the figure below.  

 

DIN

 Rail 

CONFIGURATION 

Use the 

Configuration Tool

 to configure the Intesis gateway. 

 
See instructions to download and install the latest version at:  

https://intesis.com/docs/software/intesis-maps-installer

 

 
Use the Ethernet connection for communication between the gateway 
and  the  configuration  tool.  See  CONNECTIONS  below  and  follow 
instructions of user’s manual for more details. 
 

Press 

Owner’s Record 

The serial number is located at the rear of the gateway. 
Record  this  information  in  the  space  provided  below. 
Refer  to  it  whenever  you  contact  upon  your  gateway 
dealer or support team regarding this product. 

Serial No.

                         

Reviews: