
C18UE001-1804
1.2
Installation
Figure 1-4 shows the installation dimensions of the robot. According to the dimensions, fix
the robot on the installation surface with M10 screws. Figure 1-5, table 1-1 and table 1-2 show
the forces and moments acting on the installation surface during operation. The strength of
surface must be considered when installing the robot.
Figure 1-5 Forces and moments acting on the installation surface
Summary of Contents for RT605 Series
Page 1: ......
Page 14: ...C18UE001 1804...
Page 26: ...C18UE001 1804 Figure 2 4 RT605 909 GB Motion range...
Page 50: ......
Page 51: ......