1) Place the screen material on the back of the built frame and slip the tension rods into the grooves
running along each side on the back of the frame on all four corner and pull the fixed frame spring to
buckle and pull the tension rods and screen surface to finish the assembling of the screen.
Spring Slot
Connection
Slot
Connection
Slot
If you choose the screen with spring structure , please follow
the steps below to install.
9
Summary of Contents for RXN Series
Page 1: ...Fixed Frame screen...
Page 16: ...WWW HIVILUX DE...