
WWW.HITZE.PL
FIREPLACES
| STOVES | BIOFIREPLACES | GARDEN HEATERS| ACCESSORIES
20
4) Fitting the fans.
After lead the power cable, slide in the fans and
fasten them with 4 aluminum rivets Ø4 mm. The
places for fixing the rivets are marked on the
picture.
5) Installation of the cable to the plug.
The illustration shows how to connect the cable to
the plug.
L - phase wire (red)
N - neutral wire (blue)
PE - protective conductor (yellow-green)
6) Finishing the assembly.
We assemble previously unscrewed grilles and
cassette door and connect the plug to the socket.
The cassette is ready for use.
6
START-UP
After the insert has been mounted and connected to the chimney, the first start-up of the insert must be
performed by an installer or a qualified ser-vice technician.
As part of the start-up procedure, the installer should show the User how to operate the insert correctly.
The installer is obliged to refuse to put the insert into use if he or she finds any assembly-related irregularities
which make it unsafe to use.
A correctly performed start-up should be confirmed in writing in the guaran-tee card.
6.1
Getting ready for the start-up
Before lighting the cassette for the first time, it is necessary: