ACVA - ACVBA
Installation, operation and maintenance instructions
8
BEFORE START UP
•
Check the following points:
o
Wires are well tightened.
o
Panels are firmly secured with screws.
o
There are no oil or refrigerant leaks.
o
The unit is correctly levelled.
o
There is enough space for service and maintenance.
o
Drainage is not blocked.
o
Crankcase heater has been working at least 24 hours prior to the start-up.
o
Air filters are clean and correctly mounted.
o
Grilles, air diffusers, air ducts and flexible connections are in good condition.
o
Electrical power source is in accordance with what is said in the nameplate.
o
Fans rotate in the right direction.
.
START UP
•
Start up should be performed by qualified technical people.
•
Use a start up check list: record inlet and outlet temperatures and pressures, outdoor air
temperature, volts and amps of each compressor and each fan motor, suction and
discharge pressure of each compressor.
•
Use a similar check list for service and maintenance works.
•
Remember that after 4 hours of operation, it is necessary to clean the filters.
•
Monitor at least 3 cooling cycle operations.
OPERATION LIMITS
COOLING MODE
TEMPERATURE
MINIMUM
MAXIMUM
Outdoor ambient
19ºC
46ºC
Indoor dry bulb
19ºC
32ºC
Indoor wet bulb
15ºC
23ºC
HEATING MODE
TEMPERATURE
MINIMUM
MAXIMUM
Indoor dry bulb
18ºC
26ºC
Outdoor wet bulb
-7ºC
18ºC
*For temperatures of less than 19ºC it is necessary
to use the condensation control optional.
*
Summary of Contents for ACVA STD 1001
Page 15: ...ACVA ACVBA Installation operation and maintenance instructions 15 ACVA ACVBA 701 801...
Page 16: ...ACVA ACVBA Installation operation and maintenance instructions 16 ACVA ACVBA 1001 1201...
Page 17: ...ACVA ACVBA Installation operation and maintenance instructions 17 ACVA ACVBA 1402 1502 1602...
Page 18: ...ACVA ACVBA Installation operation and maintenance instructions 18 ACVA ACVBA 2002 2302 2402...