![Hitecsa ACVA STD 1001 Installation, Operation And Maintenance Instructions Download Page 5](http://html1.mh-extra.com/html/hitecsa/acva-std-1001/acva-std-1001_installation-operation-and-maintenance-instructions_2140033005.webp)
ACVA - ACVBA
Installation, operation and maintenance instructions
5
RECEPTION
INSPECTION UPON RECEIPT
•
Units are delivered with special protective packing; therefore when it arrives, please
inspect it carefully to check that no damage has occurred during transport and that the
unit has been supplied complete with all parts specified in the order. If any damage is
found, immediately file a claim with the transport company.
•
Verify the correct voltage of the nameplate and make sure it’s in accordance with local
power supply.
•
In case of any flaw or anomaly detected, please contact HITECSA
RIGGING
•
Before moving the unit, make sure that all panels are well fixed.
•
Raise and set down the equipment carefully.
•
Do not tilt the unit more than 15 degrees during transportation.
•
When lifting the unit, make sure that it’s balanced and stable; bear in mind that the
heaviest part is where the compressor is installed.
•
Check minimum length of wire raising (Fig.1)
Fig
.1
Summary of Contents for ACVA STD 1001
Page 15: ...ACVA ACVBA Installation operation and maintenance instructions 15 ACVA ACVBA 701 801...
Page 16: ...ACVA ACVBA Installation operation and maintenance instructions 16 ACVA ACVBA 1001 1201...
Page 17: ...ACVA ACVBA Installation operation and maintenance instructions 17 ACVA ACVBA 1402 1502 1602...
Page 18: ...ACVA ACVBA Installation operation and maintenance instructions 18 ACVA ACVBA 2002 2302 2402...