ACVA - ACVBA 
Installation, operation and maintenance instructions 

 

 

Installation, operation and maintenance instructions 

 
 

ACVA – Cooling Only 

ACVBA – Heat Pump                                                

 

SELF-CONTAINED VERTICAL UNITS 
MONOBLOC AIR-AIR 
 

                                                             

 

 

 
 
 

 
 

 

Summary of Contents for ACVA STD 1001

Page 1: ...ACVA ACVBA Installation operation and maintenance instructions 1 Installation operation and maintenance instructions ACVA Cooling Only ACVBA Heat Pump SELF CONTAINED VERTICAL UNITS MONOBLOC AIR AIR...

Page 2: ...Installation operation and maintenance instructions 2 INDEX INTRODUCTION 3 SAFETY PRECAUTIONS 4 RECEPTION 5 INSTALLATION LOCATION 6 START UP 8 TECHNICAL DATA 11 DIMENSIONS 14 REFRIGERANT CHARGE 18 MAI...

Page 3: ...are potentially hazardous and must be kept out of reach of children Recycle packing materials in accordance with local legislation The units must be used only for the purpose for which they are design...

Page 4: ...operation and maintenance instructions as well as the ones indicated in labels of the unit Do not forget to strictly follow any other safety codes Use safety glasses work gloves and any other safety a...

Page 5: ...tely file a claim with the transport company Verify the correct voltage of the nameplate and make sure it s in accordance with local power supply In case of any flaw or anomaly detected please contact...

Page 6: ...aximum 50 C minimum 10 C Maximum humidity 90 INSTALLATION LOCATION Check if the base is able to support the weight of unit during operation Reserve a minimum service area according to Fig 2 Choose a p...

Page 7: ...tenance instructions 7 UNIT SETTLEMENT Make sure that the unit is correctly levelled The bed frame should be strong and solid enough to support the weight of the machine Verify that the indoor drain i...

Page 8: ...Fans rotate in the right direction START UP Start up should be performed by qualified technical people Use a start up check list record inlet and outlet temperatures and pressures outdoor air temperat...

Page 9: ...ta shown on the nameplate HITECSA will not be held responsible for damages resulted from non observance of the above Always use the wiring diagram sent with the unit to make electrical connections Che...

Page 10: ...than the unit connection depending on line length and general building configuration Drainage line should have a minimum inclination of 2 for proper water evacuation When drainage line is exposed to t...

Page 11: ...0 3540 4720 4720 Available static pressure Pa 43 50 60 55 55 Model 10 10 DD 10 10 SS 10 10 SS 12 12 SS 12 12 SS Capacity kW 0 25 0 55 0 55 0 75 0 75 Speed r p m 872 870 1032 809 809 Voltage Total inpu...

Page 12: ...ssure Pa 53 83 73 91 130 Model 12 12 SS 12 12 SS 12 12 G2L 12 12 G2L 12 12 G2L Capacity kW 1 1 1 1 1 1 1 5 1 5 Speed r p m 891 910 800 896 862 Voltage Total input power cooling kW 10 9 10 9 13 4 14 4...

Page 13: ...2 2 2 3 3 3 Speed r p m 913 913 734 787 734 Voltage Total input power cooling kW 19 8 20 8 27 0 28 3 34 2 Total input current cooling A 36 0 37 0 48 1 56 1 57 2 Total input power heating kW 17 5 18 6...

Page 14: ...ACVA ACVBA Installation operation and maintenance instructions 14 DIMENSIONS ACVA ACVBA 351 501...

Page 15: ...ACVA ACVBA Installation operation and maintenance instructions 15 ACVA ACVBA 701 801...

Page 16: ...ACVA ACVBA Installation operation and maintenance instructions 16 ACVA ACVBA 1001 1201...

Page 17: ...ACVA ACVBA Installation operation and maintenance instructions 17 ACVA ACVBA 1402 1502 1602...

Page 18: ...ACVA ACVBA Installation operation and maintenance instructions 18 ACVA ACVBA 2002 2302 2402...

Page 19: ...fill the circuit with dry nitrogen Combustion of R410a refrigerant generates toxic gases Repair immediately any refrigerant leak Never overcharge the system Never use compressor as a vacuum pump If s...

Page 20: ...ission belt at least twice during the first month of operation and then check every 1 000 hours Fan and motors do not need additional lubrication Drainage system verify condition and good operation of...

Page 21: ...allation operation and maintenance instructions 21 www hitecsa com HITECSA AIRE ACONDICIONADO S L U Masia Torrents 2 08800 Vilanova i la Geltr Barcelona SPAIN Tel 34 93 893 49 12 Fax 34 93 893 96 15 i...

Reviews: