1. Power on the PDUs.
2. Confirm that the top (POWER) LED on the lower left front side of the controller is lit amber, as shown in the
following figure. If the storage system has a drive tray, confirm that the POWER LED on the lower left front side of
the drive tray is lit green.
Item
Description
1
POWER LED on the front of the controller
3. If the front bezel is not attached to the front of the controller, attach it as follows:
1. Line up the two tabs on the left side of the controller with the two slots on the left side of the bezel.
2. Connect the bezel by sliding it on and swinging the bezel closed.
3. Use the key to secure the bezel to the front of the unit.
4. On the lower left front side of the controller, press and hold the POWER ON/OFF button until the POWER LED
changes to green (about 3 seconds), and then release the button.
5. Wait for the green READY LED on the front of the controller to go on (approximately 13 minutes).
NoteIf the READY LED does not go on after 30 minutes, contact customer support.
Step 6: Perform the initial setup
Initial setup of the storage system is performed using the Windows-based management console.
Preparing the storage system
Before you begin
Confirm that the Windows-based management console has an Internet connection and an installed version of one of the
following web browsers: Internet Explorer version 11 or later, Chrome, or Firefox.
Procedure
Updated: Thu, 06 Jan 2022 00:49:25 GMT
Powered by
7