![Hitachi RPS-90AN Instruction Manual Download Page 3](http://html.mh-extra.com/html/hitachi/rps-90an/rps-90an_instruction-manual_2139423003.webp)
—
CONTENTS —
No.
Item
Page
Operation
Instruction
………………………………………………………………..
1
1. PREPARATION
1.1 Installation Location ……………………………………………………………….. 8
1.2
Installation
Space
…………………………………………………………………...8
1.3
Foundation
…………………………………………………………………………..10
1.4
Unit
Check
…………………………………………………………………………..10
2. INSTALLATION
2.1 Anti-tumbler for Indoor Unit ………………………………………………………11
2.2 Anti-tumbler for Outdoor Unit ………………………………………………………12
3. REFRIGERANT AND DRAINAGE PIPING
3.1 Preparations ………………………………………………………………………..13
3.2 Refrigerant Piping ……………………………………………………………….....14
3.3 Drainage Piping ……………………………………………………………….........15
4. EVACUATION AND REFRIGERANT CHARGE
4.1 Evacuation Procedure ………………………………………………………........16
4.2 Refrigerant
Charge
……………………………………………………………….16
5. ELECTRICAL
WIRING
5.1 Schedule Check………………………………………..........................................17
5.2 Main Power Wiring Procedures…………..........................................................17
5.3 Main Power Wiring Specification......................................................................18
5.4 Control Wiring……………………………………………......................................18
5.5 Grounding Specification...................................................................................18
6. TEST
RUNNING
6.1 Final Installation Check………………...............................................................19
6.2 Preparation…...................................................................................................19
6.3 Test Running....................................................................................................19
6.4 Safety and Control Device Setting…................................................................20
7. MAINTENANCE
7.1 Components………………………………………………………….......................21
7.2 Lubrication…………………………………………………………………...............21
7.3 Refrigerant Charge…………………………………………………………….........21
7.4 Compressor Removal
…………………………………………………………........21
7.5 Start-Up After Extended Shutdown………………………………………………..22
7.6 Replacement of Parts ……………………………………………….......................22