
2
6
Attention for Removing Service Cover
– Procedures of Removing Cover –
1) Remove the screws according to the figure above.
NOTE:
Remove the screws and hold the service cover with your hands. If not,
the service cover may fall down.
2) Slowly push the service cover downward.
(2) Use securely two wrenches at the following position when removing or installing the pipe. (If not,
refrigerant leakage may occur.)
Controlling torque of hexagonal wrench
Model
Gas side stop valve
Liquid side stop valve
RAS-3.0~7.0HNSKQ
11~14 N·m
7~9 N·m
(3) If the direction of the refrigerant piping has been chosen, please remove the piping cover from the unit,
punch out the holes following the guide line with a screwdriver and a hammer. Then, deburr the holes and
attach insulation (field-supplied) for protection of cables and pipes.
(a)Front and Right Side Piping Work
(b)
Bottom Side Piping Work
(c)
Rear Side Piping Work
◆
Protect cables and refrigerant pipes from the edges of the holes with insulations, etc. (Field- supplied).
◆
Prevent the cables from contacting with the refrigerant piping and the hot components of the unit directly.
◆
For the right side and rear side piping work, secure enough space for the piping.