
--- 16 ---
9. STANDARD REPAIR TIME (UNIT) SCHEDULES
MODEL
10
20
30
40
50
60 min.
Fixed
Variable
P 20DA
Work Flow
Front Base
Knob
Spring
Rubber Packing
Screw Plate
Belt
Pulley (A)
Pulley (B)
Rear Base
End Bracket
Motor with Fan
Cutter Block
Ass'y
Ball Bearing
(6200VV) x 2
Ball Bearing
(6000VV)
Housing
General Assembly
Switch
Terminal x 2
Blade Holder
Bolt
Planer Blades
Back Blade