
−
8
−
For N.Z.:
Fig. 17
1-4. Remaingin Reassembly:
Remaining reassembly can be accomplished by following the disassembly procedures in reverse.
1-5. Insulation Tests:
On completion of disassembly and repair, carefully measure the insulation resistance and conduct
dielectric strength test.
Insulation Resistance: 7M
Ω
or more with 500V DC Megohm Tester
Dielectric Strength:
AC 4000V/1 minute, with no abnormalities ................... 220V - 240V
(and 110V for U.K. products)
AC 2500V/1 minute, with no abnormalities ................... 110V - 127V
(except U.K. products)
Choke Coil
Noise Suppressor
Trigger Switch
Summary of Contents for CR12
Page 1: ......