42
CPX2(M1-20WL)
7. Wiring diagram
Wiring diagram 1
W
W
i
i
r
r
r
r
i
i
n
n
g
g
o
o
f
f
t
t
h
h
e
e
c
c
i
i
r
r
c
c
u
u
i
i
t
t
p
p
o
o
w
w
e
e
r
r
s
s
u
u
p
p
p
p
l
l
y
y
(1)
Attach the CNPOW and TSW.
(2)
Attach the CNSH.
(3)
Attach the power sheet.
CNSH
CNPOW
CN202
TSW
CN201
Attaching the power sheet
Attach the sheet on the ballast cables.
Make sure not to pile the ballast cables.
The space between power supply and main board
is little.
Piled cables lift the main board.
Ballast cable
Power unit sheet
Area of Importance
The operat
ions with this symbol have implications
with laws/standards. It is possible to be in violatio
n of these laws/standards in the case that these o
perations are not carried out according to the instr
uctions. As
semble ac
cording to the operation instr
uctions.
A
ttach the CNSH to the Power unit
bracket with screw.
Area of Importance
Make sure to confirm the print of the TSW.
Area of Importance
「
YS11A95A-**
」(
95
℃)