![Hitachi C 8FSC Handling Instructions Manual Download Page 11](http://html.mh-extra.com/html/hitachi/c-8fsc/c-8fsc_handling-instructions-manual_145773011.webp)
11
PREPARATION BEFORE OPERATION
Make the following preparations before operating the power tool:
1. Installation
Fig. 4
Attach the power tool to a level, horizontal work bench in accordance with Fig. 4.
Select 8mm (5/16") diameter bolts suitable in length for the thickness of the work bench.
Bolt length should be at least 25mm (1") plus the thickness of the work bench.
For example, use 50mm (2") or larger bolts for a 25mm (1") thick work bench.
The holder attached to the rear of the base helps stabilize the power tool.
Base holder adjustment:
Loosen the 6mm bolt with the supplied 10mm
box wrench.
Adjust the base holder until its bottom surface
contacts the work bench surface.
After adjustment, firmly tighten the 6mm bolt.
Fig. 5
6mm bolt
Move
Adjust the base
holder until its
bottom surface
contacts the work
bench surface.
Holder
150mm (5-29/32")
300mm (11-13/16")
9mm (11/32")
3 Holes
264mm (10-13/32")
Work bench
8mm (5/16") nut
8mm (5/16") bolt
Base
25mm (1") thick bench
01Eng_C8FSC_Eng
29/5/07, 17:55
11