
8
30 to 50mm
(1-3/16 to
1-15/16 inch)
Suspension Bolt (M10 or W3/8)
(Field-Supplied)
Nut (Field-Supplied)
Double-Nut (Field-Supplied)
Washer (Field-Supplied)
Suspension Bracket
(Equipped with
Switch
Box)
Washer (Field-Supplied)
Switch
Box
Suspension Bolt
Suspension Bracket
Upper Side
Figure 4.4 Suspension
Bottom Side
Figure 4.5 Hanging Method
4.4.3 Mounting and Hanging the
Switch
Box
(1) Put nuts on each of the two suspension bolts
before hanging the
Switch
Box, as
shown in Figure 4.4.
T
Mounting washers are required in order
to affix the suspension bracket to the
suspension bolt.
Field-Supplied Parts
* Suspension Bolt: 2-M10 or W3/8
* Nut:
* Washer:
6-M10 or W3/8
4-M10 or W3/8
(2) Hanging the
Switch
Box
(a) Hang the
Switch
Box by putting hands on the
bottom of the cabinet.
(b) Insert the suspension bolt into the groove
part of the suspension bracket as shown
in Figure 4.5. Ensure that the washers
are correctly affixed to the suspension
bracket.
(c) After the hanging work, the piping and
wiring connection work is required inside
the ceiling in the gap between the roof and
ceiling so it is not visible. Therefore,
determine the drawing direction of the pipe
after selecting the installation location of the
Switch
Box. Before doing the hanging
work, carry out the piping and wiring work
up to the connecting positions.
(d) Keep the
Switch
Box level to the ceiling
surface. If the
Switch
Box is not level, a
malfunction may occur.
(e) Tighten the nuts of the suspension
bolt with the suspension bracket after
adjustment is completed.
Adhesive must be applied to the nuts in
order to prevent them from loosening.
4.4.2 Marking of the Positions of the Suspension
Bolts and Wiring Connections
(1) Mark the positions of the suspension bolts,
refrigerant piping connections and wiring
connection.
(2) Installation dimensions are shown in
Figure 2.1.