
40(1-9/16)
23(7/8)
11(2-7/16) x 34(1-5/16)
Slotted Hole
330(13)
Electrical Box
(For Suspension Bolt)
Suspension Bracket
Unit: mm(inch)
C-shaped
Clamp
Antiskid Clamp
(Bend it)
Suspension Bolt
Support Angle
Nut
Suspension
Bolt
Suspension Bolt
(M10 or W3/8)
Suspension Bolt
(M10 or W3/8)
Suspension Bolt
(M10 or W3/8)
Suspension Bolt
(M10 or W3/8)
I Beam
For Steel Beam
For Concrete Slab
(1) Hole-In Anchor
Wooden Bar
(60 to 90mm
(2-3/8 to 3-9/16 inch) Square)
Wooden
Beam
Square
Washer
Square
Washer
Nut
Nut
For Wooden Beam
Insert
100 to 150 kg
(220 to 331 lbs.)
Concrete
Steal
For Reinforcing Steel
Inserting
Inserting
(with impulse rotation)
Resin Capsule
Stiffening
Agent
Glass
Stone
Epoxy Resin
(2) Resin Capsule
150 to 160mm
(5-7/8 to 6-5/16 inch)
Part
A
Part B
Unit Body
Use a hole saw
to make a hole.
Use a hole saw
to make a hole.
Fixing Bolt
Fixing
Use a suspension bolt with 30 to 45
o
sloping edge.
Use the resin capsule within the warranty period.
Resin capsules deteriorate over time and should be used within
six mounths of the manufacturing date.
20
o
C
15
o
C
10
o
C
5
o
C
0
o
C
(68
o
F)
(59
o
F)
(50
o
F)
(41
o
F)
(32
o
F)
Min. 30min.
Min. 1hr.
Min. 2hr.
Min. 4hr.
Min. 8hr.
Ambient Temp.
Time
After inserting, do not rotate or put any force until resin is hardened.
Required time is as shown in the table at right.
Use a suspension bolt (W3/8, Metric screw thread: M10).
Prepare washer and nut.
NOTE:
Break a head portion
of anchor by using
a hammer.
4.3
Suspension
Bolts
Step 1
(1)
Select
a
fina
l
location
and
installation
direction of the
Switch Box.
Pay careful attention to the space for the
piping, wiring and maintenance.
(2)
Mount
suspension
bolts.
(3)
Mount
the
suspension
bolts
in
the
slotted
hole
on
the
electrical
box
side
as
shown
in
Figure
4.2.
(4)
Contact
a
qualifie
d
contractor
or
carpenter
for
the
ceiling
treatment.
Step 2
Mount
suspension
bolts,
as
shown
in
Figure
4.3.
Figure
4.3
Mounting
of
Suspension
Bolts
Figure
4.2
Position
of
Suspension
Bolts
6