5
Product Installation
Hearth opening and hob installation
400m
m
700
mm
≥
50mm
4
-
R20
1. Draw lines on the surface of the hearth and cut an opening according to the following drawing or the
drawing and size indicated on the opening template on the packing case.
2. Insert the stove with the battery installed in the opening, and confirm that the stove is installed flatly. For
glass panel stoves, paste panel sealing rubber strip around the bottom of the panel.
Vent
Installation of intake pipe
A.Hob connected with rubber hose
B. Hob connected with metal hose
1. Put the sealing gasket into the inlet connection first;
2. Then screw the inlet connection onto the universal
joint of the stove;
3. Put the inlet hose (must be special gas hose) on the
inlet connection (red painted mark) and clamp it
tightly.
1. Install the sealing gasket in the metal hose nut;
2. Then tighten the nut on the universal joint of the
stove.
Red painted
mark
Gas rubber
hose
Clamp
Universal
joint
Metal hose
Universal joint
Sealing
gasket
Nut
Gas tightness test
Turn on the gas supply switch and use soapy water to check whether there are bubbles at the hose
connection. If any gas leak, it must be reinstalled.