
Installation Instructions
14
ML23.8 User Manual, 99182A, April 2022
3�
Cut a rectangular hole in the panel.
f
Cutout Dimensions (W x H) for the HIS-ML23.8:
566.7 mm x 342.4 mm (22.31" x 13.48"); ± 0.5 mm (0.020")
4� Clean and deburr the panel hole�
5�
Separate the rear collar from the monitor by removing the 10 nuts.
6�
Refer to the enclosure mounting diagram below.
7� Insert the unit into the front of the panel and re-attach the collar�
NOTE:
Contact Hope Industrial Systems if for any reason your application does
not allow for installation of the collar�
8�
Tighten all 10 nuts to a torque of 1.13-1.7 N-m (10-15 inch-pounds) to ensure a
watertight seal between the bezel gasket on the monitor and the equipment panel.
Go around all nuts twice to ensure an even compression on gasket.
NOTE:
If a torque wrench is not available, tighten all nuts evenly until molded
frame sits flush against front of the panel. Do not overtighten.