Installation Instructions
10
ML19G User Manual, January 2015
1� Refer to the drawing below for the cutout dimensions for the HIS-ML19�
2�
366.8 mm
(14.44")
453.4 mm
(17.85")
Locate position in panel for mounting of the monitor� Ensure that there is adequate
space behind the panel� Allow extra space – 25�4 mm (1�0") behind and on each
side – for air ventilation�
Step 3: Install into Panel
Once you have completed the full bench-test configuration and confirmed that all components are
working properly, you are ready to install the monitor into its panel cutout�
WARNING!
Hope Industrial Systems will not assume liability for damage to internal electronics
due to improper installation� Contact Hope Industrial Systems if you need additional
assistance�
!