HIRED-HAND 24

 

Part No. 4801-5369 Rev. 10-07 

Chimney Vent 

Page 8 of 12 

 
 
 

6.2

 

Attach Flashing 

See Figure 10.  Attach the two Ridge 
Mount Flashing sections.  Attach the two 
Side Mount Flashing sections.  
Additional caulking may be required 
depending on local requirements. 
 
 
 
 
 
 
 

6.3

 

Attach Canopy to Chamber 

See Figure 11.  Place the 
Canopy over the Support 
Brackets and align the Canopy 
evenly on the Support 
Brackets.  For the 24 inch 
canopy, mark the location of 
the eight holes in the Support 
Brackets on the Canopy.  Drill 
a 3/8 inch hole for the 
mounting hardware.   
The 36 inch canopy has the 
mounting holes predrilled. 
 
Line up the mounting holes in 
the Canopy and bolt the 
Canopy to the Canopy Support 
Brackets on the chamber using 
(8) 5/16 x 1 inch bolts, (8) 5/16 
whiz nuts and (8) fender 
washers.  The washers and the 
heads of the bolts go on the 
outside of the Canopy. 

 
 
 
 
 
 
 
 

7.

 

Operation of the Chimney Vent 

The linear actuator should be adjusted 
so the tension on the cable and spring 
assembly uses no more than half of the 
spring travel when the vent is closed 
completely.  See Section 8. 

 

 

Figure 11  Install the Canopy

 

Figure 10  Install the Flashing 

Side Mount 

Flashing

Ridge Mount 
Flashing 

5/16" Fender 
Washers on 
top of 
Canopy 

Canopy 

Support 

Brackets

Summary of Contents for 24" & 36" Chimney Vent

Page 1: ...Part No 4801 5369 Rev 10 07 Owners Manual Chimney Vent 24 36 Chimney Vent Owners Manual Hired Hand Manufacturing Inc 1733 County Road 68 PO Box 99 Bremen Alabama 35033...

Page 2: ...9 Attach Winter Door 7 5 10 Attach Cables to the Baffle 7 6 Installing the Chimney Vent in the Roof 7 6 1 Install the Chamber 7 6 2 Attach Flashing 8 6 3 Attach Canopy to Chamber 8 7 Operation of the...

Page 3: ...f purchase if installed and used in strict accordance with the installation instructions Liability is limited to the sale price of any products proved to be defective or at manufacturer s option to th...

Page 4: ...he inside of the chamber Install but do not tighten the bottom screws in the Chamber These bolts will be removed in a later step NOTE Tighten other lock nuts securely but do not distort the extruded c...

Page 5: ...first connect the Front and Left sides together Then connect the Right and Rear panels together Use 4 x 1 3 4 inch bolts 4 metal washers and 4 inch lock nuts on each aluminum corner channel Place the...

Page 6: ...the bottom bolts of the Extension at this time They will be removed later to install additional hardware 4 Verify that the Baffle can rotate freely after bolting the Extension together 5 7 Attach Pull...

Page 7: ...his section covers the necessary steps to install the Chimney Vent into the roof of the confinement building Assembly steps in Section 5 should be completed before proceeding with Section 6 6 1 Instal...

Page 8: ...le for the mounting hardware The 36 inch canopy has the mounting holes predrilled Line up the mounting holes in the Canopy and bolt the Canopy to the Canopy Support Brackets on the chamber using 8 5 1...

Page 9: ...en the linear actuator operates the rod is pulled to the left in the example below hence opening the baffles When the actuator reverses the spring force closes the baffles The door cable can be fasten...

Page 10: ...Assembly 1 6409 3011 8 Wire Guard Bird Screen 1 0401 5781 9 Wire Guard Mounting Strip 2 0401 5661 10 Winter Door Assembly 1 6409 3000 Hired Hand 36 Chimney Vent Parts Assemblies Item Description Quan...

Page 11: ...Part No 4801 5369 Rev 10 07 Chimney Vent Page 11 of 12 NOTES...

Page 12: ...24 36 Chimney Vent...

Reviews: