119
Calibration
9.6 Calibration
The calibration period varies with the conditions and environment of use. It is recommended
to determine a calibration period based on those factors and to have the instrument regularly
calibrated by Hioki.
9.7 Disposing of the RM2611 Electrode Resistance
Meter
The RM2611 Electrode Resistance Meter uses a lithium battery to back up its clock. When
disposing of the RM2611 Electrode Resistance Meter, remove this battery and follow all applicable
regulations in your region.
Removing the lithium battery
DANGER
To prevent electric shock, turn off the RM2611 Electrode Resistance Meter’s
main power switch and disconnect the power cord and connection cable before
removing the lithium battery from the instrument.
CAUTION
Exercise care not to short the battery’s positive and negative terminals. Doing so may
cause sparks.
10
9
7
6
5
4
3
2
1
索引
8
Maintenance and Service
Summary of Contents for RM2610
Page 2: ......
Page 12: ...8 Operating Precautions...
Page 22: ...18 USB License Key and Screens RM2612 Resistance Calculation Software...
Page 54: ...50 Checking Measurement Results...
Page 72: ...68 Setting Administrator Mode...
Page 110: ...106 Under what circumstances do contact errors occur...
Page 128: ...124 Dimensional Drawings 10 2 Dimensional Drawings RM2611 Electrode Resistance Meter Unit mm...
Page 130: ...126 Dimensional Drawings RM9005 Connection Cable Unit mm...
Page 134: ...130 Index...
Page 135: ......
Page 136: ......
Page 137: ......
Page 138: ......