
page 2
February 2014
Product Data Sheet
HIT-HY 200
with HIT-Z
Approvals / certificates
Description
Authority / Laboratory
No. / date of issue
European technical approval
a)
DIBt, Berlin
ETA-12/0028 / 2013-03-15
(HIT-HY 200-R)
Fire test report
IBMB, Brunswick
3501/676/13 / 2012-08-03
a) All data given in this section according ETA-12/0028, issue 2013-03-15.
Working time, curing time
Temperature of the base material
HIT-HY 200-R
Working time in which anchor
can be inserted and adjusted t
work
Curing time before anchor
can be loaded t
cure
5 °C
1 hour
3 hour
6 °C to 10 °C
40 min
2 hour
11 °C to 20 °C
15 min
1 hour
21 °C to 30 °C
9 min
1 hour
31 °C to 40 °C
6 min
1 hour
Anchor size
M8
M10
M12
M16
M20
Nominal diameter of drill bit
d
0
[mm]
10
12
14
18
22
Effective embedment and drill hole depth
range a) for HIT-V
h
nom,min
[mm]
60
60
60
96
100
h
nom,max
[mm]
100
120
150
200
220
Minimum base material thickness
h
min
[mm]
h
nom
+ 60
h
nom
+ 100
Pre-setting:
Diameter of clearancehole in the fixture
d
f
≤
[mm]
9
12
14
18
22
Through-setting:
Diameter of clearance hole in the fixture
d
f
≤
[mm]
11
14
16
20
24
Torque moment
T
max
[Nm]
10
25
40
80
150
Setting details