![hilscher PKV 50 Series Device Manual Download Page 8](http://html1.mh-extra.com/html/hilscher/pkv-50-series/pkv-50-series_device-manual_2134834008.webp)
3.1.1 Loading Files into the Gateway
This function enables to load files into the User FLASH of the Gateway and to
carry out applications after downloading or after the start of the operating system.
Before a new application or a new and already available DLL can be downloa-
ded, any running older versions of the application or programs that use DLLs
must be ended. For this purpose, the corresponding running processes can be dis-
played under the
Configuration > View Running Tasks
menu. If an entry has
been selected, then the
Stop Process
button can
be
activated and the selected
process is stopped.
In order to transfer a new file, select the
File
> Copy to PKV
menu or activate
the
Copy to PKV
button. Select the file to be loaded in the dialog that appears
now.
Dialog for loading files on to the PKV 50 Gateway
The path and name can be entered directly into the
Source (PC)
text field or se-
lect the path and file via the
...
button. The
Destination (PKV)
field cannot be
edited at present. All the files to be copied are read into the Windows directory of
the Gateway. According to requirements, now mark the buttons
Save persistent,
Execute after download
and
Execute after PKV boot
. Now activate the
Down-
load
button and the software is transferred to the Gateway.
General Device Description
8
Copyright * Hilscher Gesellschaft für Systemautomation mbH * De:PKV50#2EN