Hilmerson Safety Safety Rail System Installation Instructions Manual Download Page 10

10 

*Approved fall protection must be utilized while installing bases and guardrails where fall hazards exist. 

Installing Guardrail Panels 

   

 

 

 
 

 

 
 

 
 

 

 

 

 

1.

 

To install guardrail panels on 
either type of baseplate, simply 

remove a guardrail panel from 
the mobile cart and seat on the 

base plate post. 

 
 
 
 
 
 
 
 
 
 
 

2.

 

When seating and positioning 

guardrail panels on baseplates, 
ensure that holes are aligned to 

allow pinning.  

 

 
 
 
 
 
 
 
 
 
 

 

 

 

 

 

   

 

 

 

   

 

 

 

 

 

Summary of Contents for Safety Rail System

Page 1: ...merson Safety Rail System poses a threat to safety and health and may result in death or serious injury to installers users and or third parties Hilmerson Safety and our manufacturer expressly disclai...

Page 2: ...deck that changes location as additional floor roof or deck or formwork sections are placed or constructed A leading edge is considered an unprotected side and edge OUTRIGGER RETURN A 5 ft or 10 ft gu...

Page 3: ...nstalled on is capable of supporting the product and personnel installing it A complete assessment of the entire surrounding areas should be made to determine if the walking and working surfaces have...

Page 4: ...nel 5 5 ft 9ft Adjustable 1 O D x Galvanized 13 gage tube Warning It is recommended that a competent person approve and oversee the installation of this system The Hilmerson Safety Rail System is an e...

Page 5: ...ade 50 Steel Galvanized E HLM GRBPG Penetrating Anchored Base Plate ASTM A572 Grade 50 Steel Galvanized F HLM GRBPDL Weighted Base Dolly 1 O D x Galvanized 13 gage tube Powder Coated G HLM RS3G 22 34...

Page 6: ...he desired protection layout before beginning the installation process 3 All guardrail layouts must be designed or approved by a competent person 4 When using penetrating anchored base plates anchor b...

Page 7: ...gth of f c 3 000 psi normal weight cracked concrete Non penetrating weighted bases are recommended for use on post tension decks or other surfaces where you can t penetrate 2 Pre drill a diameter hole...

Page 8: ...n 418072 through the top of the base plate and into the pre drilled hole according to Hilti p n 418072 x 3 KWIK HUS EZ KH EZ installation requirements 2 Tighten the anchor bolt until it is seated on...

Page 9: ...to set up guardrail protection on a wide variety of surfaces but shall be no closer than 18 inches from the leading edge requiring protection unless there is an elevated parapet wall 2 Install only o...

Page 10: ...hazards exist Installing Guardrail Panels 1 To install guardrail panels on either type of baseplate simply remove a guardrail panel from the mobile cart and seat on the base plate post 2 When seating...

Page 11: ...stalling Guardrail Panels 3 Install a gravity locking pin through the base plate post and guardrail panel making sure that the loop on the pin falls into the locked position 4 When installing guardrai...

Page 12: ...return guardrail panels and weighted bases are required to be installed perpendicular to the leading edge at the end of each protection run to provide required counterweight 2 Upon completion of insta...

Page 13: ...re accurate to a degree consistent with current practice s Hilmerson Safety Services Inc and its affiliates do not assume responsibility for errors or oversights that may result from the use of the in...

Reviews: