MinMoe Temperature Screening Terminal Installation Guide
Mercury SD Product Support Team
4
2. Installation process
3. System implementation considerations
3.1 Site survey precautions
It is not recommended for outdoor use. It is recommended to install in indoor closed, constant temperature,
no wind (including natural wind, air conditioning wind, etc.) and no direct sunlight.
For indoor use, the indoor ambient temperature must be 10 ~ 35 ° C. If beyond this range, the temperature
measurement accuracy of the device cannot be guaranteed.
When used outdoors (including semi-open scenes such as doorways), human body temperature measurement
accuracy cannot be guaranteed steadily, and guests / users should be guided to move the equipment indoors
for installation.
MinMoe face recognition terminal installation requirements: the visible light channel has enough illumination,
and avoid backlighting / reflecting / blocking / etc.
Avoid non-human high-temperature targets and reflective surfaces in the detection scene
The above installation precautions, please explain to the user before the project and should be strictly
implement;
3.2 Precautions when measuring human temperature
When an outdoor person first enters the room, they need to take off their hats and lift their bangs. It is
recommended to wait for 3 to 5 minutes and wait for the body surface temperature to stabilize.
When moving from far to near, the temperature measurement results in the vicinity may appear high; the flow
guidance line needs to be arranged at the site, when the temperature of the human body is measured at a fixed
distance (recommend 0.5 to 1.5 m), person should walk to left or right side to avoid moving toward the device.
When measuring human body temperature, personnel need to stand at a fixed distance, pass one by one, make
a short stop, and face directly to the camera.
The above temperature measurement precautions should be strictly implemented in project site.
Preparation before installation
1. Safety instruction
2. Function instruction
3. Installation site survey
4. Product selection
Site installation
1. Installation guide
2. Parameter configuration
3. Device debug
Project delivery
1. Delivery acceptance checklist
2. Routine maintenance and
recommendations