Chapter 2 System Wiring
The preparation before installation and general wiring.
Steps
1. Draw a central line on the installation surface of the left or right pedestal.
2. Draw other parallel lines for installing the other pedestals.
Note
The distance between the nearest two line is L+200 mm. L represents the lane width.
3. Slot on the installation surface and dig installation holes according to the diagram.
Figure 2-1 Hole Position Diagram
4. Bury cables. Each lane buries 1 network cable and 1 high voltage cable. For details, see the
system wiring diagram above.
Note
●
The suggested inner diameter of the low voltage conduit is larger than 30 mm.
●
If the face recognition module are required to be connected on the left lane, you should
increase the conduit diameter or bury another conduit for the external cables.
●
You should bury one network cable and one high voltage conduit for the right and middle
lane.
●
The network cable must be CAT5e or the network cable has better performance.
DS-K3G411LX Series Tripod Turnstile User Manual
3
Summary of Contents for DS-K3G411LX Series
Page 1: ...DS K3G411LX Series Tripod Turnstile User Manual...
Page 32: ...UD30763B...