Quick Start Guide of Blazer Express Station
8
Wiring of Alarm Output
To connect to an alarm output (AC or DC load), use the following diagram:
DC Load Connection Diagram AC Load Connection Diagram
For DC load, the jumpers can be used within the limit of 12V/1A safely.
To connect an AC load, jumpers should be left open (you must remove the jumper on
the motherboard in the Blazer Express). Use an external relay for safety (as shown in
the figure above).
There are 2 jumpers (JP1, and JP2) on the motherboard, each corresponding with one
alarm output. By default, jumpers are connected. To connect an AC load, jumpers
should be removed.
Example:
If you connect an AC load to the alarm output 2 of the Blazer Express, then you must
remove the JP2.
Using of Alarm Connectors
To connect alarm devices to the Blazer Express:
1.
Disconnect
pluggable block
from the ALARM IN/ALARM OUT terminal block.
2.
Unfasten stop screws from the
pluggable block
, insert signal cables into slots and
fasten stop screws. Ensure signal cables are in tight.
3.
Connect
pluggable block
back into terminal block.
Power Connection
Plug the power supply (refer to the
Specifications
) into an electrical outlet. It is
HIGHLY recommended that an Uninterruptible Power Supply (UPS) be used in
conjunction with the device.
Starting Up and Logging In To Blazer Express
Startup
After plugging the power supply, turn on the power switch on the rear panel and
power button on the front panel turns blue indicating that the unit begins to start up.
Next time you want to turn on the Blazer Express again after shutdown with the
power switch as on, you can just press the power button on the front panel.
After startup, the Power indicator LED remains blue.
For the first-time access to the station, you need to connect a display unit to Blazer
Express via VGA or HDMI
TM
interface. In this manual, we only introduce the basic
settings for Blazer Express. For detailed configuration, please refer to the
User
Manual of Blazer Express Web Client
.