![HIGHLEAD GC20618 Series Instruction Manual Parts Catalog Download Page 5](http://html1.mh-extra.com/html/highlead/gc20618-series/gc20618-series_instruction-manual-parts-catalog_2130547005.webp)
—
2
—
PREPARATION FOR OPERATION
O
verall view of assembled
sewing machine
1
.
Power cable connection
1)
Connection to Power Supply
When connecting the power supply connector to the control box, the connector should be completely
plugged in the proper receptacle after confirming the connector type and matching direction.
A.
In case of three-phase electrical power system, the “U” phase should be connected to the red lead,
the “V” phase to the white lead, and the “W” phase to the black lead. The motor rotary direction
depends, however, upon the setting of the internal switch in the control box as described in
Paragraph 1-(3)
CAUTION: The green wire must be connected to the ground terminal in order to ground
the motor properly.
B.
The appropriate power fuse capacity is as follows. Power supply 200V-240V
:
10A
100V-120V
:
15A
2)
Lamp Leads
A. When installing the illuminating lamp(6V,15-20W),The
connecting wire is attached on the
back of the Control box. It should be
removed and connected by
removing the insulating tube
from the wire and stripping
properly. The wire connections
should be, then, insulated by
Summary of Contents for GC20618 Series
Page 20: ...A ARM BED AND ITS ACCESSORIES 17...
Page 22: ...B THREAD TENSION REGULATOR MECHANISM 19...
Page 25: ...C ARM BED AND ITS ACCESSORIES 22...
Page 27: ...D UPPER SHAFT PRESSER FOOT MECHANISM 24...
Page 30: ...E TAKE UP THREAD AND ARM SHAFT MECHANISM 27...
Page 33: ...F STITCH REGULATOR MECHANISM 30...
Page 35: ...G LOWER SHAFT FEED ROCK SHAFT MECHANISM 32...
Page 38: ...H HOOK SADDLE MECHANISM 35...
Page 40: ...I UPPER FEED ROCK SHAFT MECHANISM 37...
Page 42: ...J KNIFE MECHANISM 39...
Page 45: ...K TOUCH BACK MECHANISM DETECTOR MECHANISM 42...
Page 47: ...L OIL LUBRICATION MECHANISM 44...
Page 50: ...M ACCESSORIES 47...