background image

2

3

MA-EN-OSMOSIS NEREO-RO-0206-XX-PSM-21-V01.0

MA-EN-OSMOSIS NEREO-RO-0206-XX-PSM-21-V01.0

INDEX

1.- INTRODUCTION ..........................................................................................................3

2.- PRECAUTIONS AND WARNINGS    .........................................................................3

3.- CHECKING THE CONTENTS ....................................................................................4

4.- INSTALLATION ...........................................................................................................6

4.1.- Faucet installation (Figure-8) ....................................................................................................... 6

4.2.- Feed Adapter installation (

Figure-13 & Figure-14

) .............................................................. 6

4.3.- Drain clamp installation (Figure-12)  ........................................................................................... 7

4.4.- Cartridge installation .................................................................................................................... 7

4.5.- Membrane installation (Figure-7) ................................................................................................. 8

4.6.- Osmosis system installation ........................................................................................................ 9

5.- OSMOSIS SYSTEM START-UP ...............................................................................12

6.- INSTALLATION & MAINTENANCE ........................................................................13

6.1.- Procedure for replacing cartridges and the membrane  ........................................................... 14

7.- TROUBLESHOOTING...............................................................................................16

8.- MONITORING AND MAINTENANCE CONTROL ..................................................18

9.- SPARE PARTS ..........................................................................................................20

9.1.- Osmosis system without pump ................................................................................................. 20

9.2.- Osmosis system with pump ....................................................................................................... 22

1.- INTRODUCTION

This manual explains the installation and operation of equipment for water treatment by reverse 

osmosis for household use. The equipment has been designed to be connected to the housing facility.

It is easy installation and operation as it has already been semi-assembled. It requires very little 

assembly as it is only necessary to connect the hydraulics, electrics and install the faucet as indicated 

in point 4 of this manual. 

In the absence of installation and maintenance as described in this manual by technically 

qualified  personnel  to  ensure  the  quality  of  water  produced  and  proper  installation,  the 

warranty is void.

2.- PRECAUTIONS AND WARNINGS   

Please read this manual carefully following the warnings listed below before going ahead 

with the installation and use of the NEREO osmosis system. If you have any doubts, please 

contact your distributor. 

•  For the correct operation of NEREO osmosis systems, the pressure should be between 2,5 - 4 bars 

for an osmosis system without pump and between 1 – 3 bar for an osmosis system with pump. If 

the pressure is greater than 4 bars in an osmosis system without pump and greater than 3 bar in 

osmosis system with pump, it is necessary to install a pressure regulator at the inlet of the osmosis 

system to avoid damaging the pump and the other components of the osmosis system.

•  The temperature of the water to be treated should not be below 5ºC nor above 35ºC to avoid 

damaging the system.

•  The osmosis system is designed to treat tap water with a maximum salinity of 1000 ppm. Do not use 

in places where the water is not microbiologically safe or has an unknown quality. For water with a 

greater salinity level, please contact your distributor. 

•  It is advisable that the water to be treated has been softened or with a maximum hardness of 

15ºHF for optimum performance. Water with a hardness greater than 15ºHF will shorten the life 

of the membrane.

•  If the water has a high concentration of iron or magnesium, nitrate concentration greater than 100 

ppm, sulphate concentrations greater than 250 ppm, more than 3 NTU turbidity and/or prolonged 

use of high chlorine levels, please contact your distributor to suggest an appropriate pre-treatment 

system to ensure the correct operation of the system.

•  The osmosis system reduces the level of the following elements; aluminium, ar-senic, bromoform, 

chlorine,  chlorides,  copper,  conductivity,  chrome,  dibromo-chloromethane,  fluorides,  nitrates, 

oxidability, pH, selenium, sodium, sulphates, PAHs, trihalomethanes and other dissolved solids.

•  If the osmosis system is not going to be used for a long period of time, close the water passage. 

• 

Install the system on a flat surface.

•  Do not expose the system to direct sunlight or install it outdoors.

Summary of Contents for NEREO

Page 1: ...USER INSTALLER S MANUAL MA EN OSMOSIS NEREO RO 0206 XX PSM 21 V01 0 RESIDENTIAL REVERSE OSMOSIS ...

Page 2: ...tems the pressure should be between 2 5 4 bars for an osmosis system without pump and between 1 3 bar for an osmosis system with pump If the pressure is greater than 4 bars in an osmosis system without pump and greater than 3 bar in osmosis system with pump it is necessary to install a pressure regulator at the inlet of the osmosis system to avoid damaging the pump and the other components of the ...

Page 3: ...ckages Use original spare parts to assure the correct performance of the system For installation maintenance and cartridge change please follow this manual otherwise the warranty will be void 3 CHECKING THE CONTENTS Open the packaging and make sure that all of the components are inside ready for the installation FIGURE DESCRIPTION 1 NEREO Osmosis system main unit 1 NEREO with pump Osmosis system m...

Page 4: ...water input a drain for wastewater a 220 240 V only NEREO osmosis system with pump socket within a metre and sufficient space to be located The most common place is under the kitchen sink The installation should be carried out by qualified personnel Brass Ball Valve Connect 3 8 Hose Adapter Connect to water supply Connect to the Osmosis System with 1 4 Tube Place Teflon a The sediment Figure 3 Car...

Page 5: ... of the surface chosen for installation so that the tubes do not get mixed up or tangled Leave a sufficient length of tube to ease moving the system during future maintenance Here are the steps to follow to make the hydraulic connection 4 6 Osmosis system installation b Open the membrane housing lid by turning it anti clockwise with the help of the wrench supplied with the system Figure 9 c Insert...

Page 6: ...ump osmosis system into an electrical outlet of 220 240 V Here is a diagram of NEREO osmosis system without pump installation g Screw the faucet adapter Figure 18 to the faucet Then connect tube Figure 11 to the faucet adapter Insert it fully Once inserted put on the security clip h The other end of the tube must be inserted through the elbow nut at the post filter outlet After inserting the corre...

Page 7: ...n before will come out for a while thenitwillgobacktodripping Waitforaboutanhour hourandahalfwiththefaucetclosed then turn it on to empty the water from the storage tank to remove a chemical product that has Open position Open position come from the membrane which is used to protect them from microbiological contamination This product isn t dangerous but could affect the taste Repeat this task twi...

Page 8: ...art of the tube take it off and cut off 0 5 cm Then reconnect it If there is a leak coming from a thread unscrew the piece apply more Teflon and screw it back on again Precaution 2 When you change the sediment carbon GAC and carbon CTO cartridges from the 1st 2nd and 3rd stage you must follow steps a b c d and e in point 5 of this manual previously closing and then posteriorly opening the water su...

Page 9: ...vel Fit a mineralizing postfilter Only equipment with pump Only equipment with pump ID SYMPTOM PROBABLE CAUSE SOLUTION 4 Plastic or synthetic taste Worn postfilter Replace postfilter 5 Unpleasant taste and smell Contamination Change the filters membrane postfilter and sanitise 6 White particles in the water Air in the system Wait for the air to pass as there s no urgent problem High pressure in th...

Page 10: ...t change Membrane change Postfilter change Sanitization Reparation Name and signature of the authorised technician or distributor DATE SERVICE MADE NEXT SERVICE OBSERVATIONS Sediments GAC y CTO cart change Membrane change Postfilter change Sanitization Reparation Name and signature of the authorised technician or distributor DATE SERVICE MADE NEXT SERVICE OBSERVATIONS Sediments GAC y CTO cart chan...

Page 11: ...ure gauge 1 14 OI 0234 04 NEREO Pressure gauge 1 15 ME 2002 02 18x12 Membrane 50 GPD 1 16 OI 0206 08 1 8 M x T elbow piece 1 17 OI 0207 117 1 8 M x T Non return elbow piece 1 18 OI 0207 33 M x T Straight 2 19 OI 0207 44 300 cc Flow restrictor 1 20 OI 0208 25 T x T x M Tee 1 21 OI 0205 20 In line Postfilter 1 22 OI 0207 16 2 x 2 Double clamp 2 23 OI 0208 12 M x T Elbow piece 1 24 OI 0234 10 Filter ...

Page 12: ...x T elbow piece 1 17 OI 0207 117 1 8 M x T Non return elbow piece 1 18 OI 0207 33 M x T Straight 2 19 OI 0207 44 300 cc Flow restrictor 1 20 OI 0208 25 3 8 T x T x M T piece 1 21 OI 0205 20 In line postfilter 1 22 OI 0207 16 2 x 2 Double clamp 2 23 OI 0208 12 M x 3 8 T Elbow piece 1 24 OI 0234 10 Filter and membrane housing wrench 1 25 OI 0207 88 T Storage tank ball valve 1 26 OI 0207 20 Drain cla...

Page 13: ...0206 XX PSM 21 V01 0 Hidro Water S L U Carretera Chirivella Aldaya 48 46960 Aldaya Valencia Spain Tel 34 961 98 62 30 hidrowater hidro water com www hidro water com DISTRIBUTOR INSTALLER Sale date Instalation date Stamp Stamp ...

Reviews: