
- 63 -
13.1
13.1
13.1
13.1 Define
Define
Define
Define Baseline
Baseline
Baseline
Baseline
【
Procedure
Procedure
Procedure
Procedure of
of
of
of defining
defining
defining
defining baseline
baseline
baseline
baseline
】
[MENU]
—
>4.Program
—
>5.Project
1.
1.
1.
1.
Select the menu item 2 to
define a baseline.
2.
2.
2.
2.
Measure the start point of
the baseline.
3.
3.
3.
3.
Aim at and measure the
end point of the baseline.
Then defining baseline is
over.
Projection
1.Height of Ins.&Targe
▲
2.Setup Baseline
3.project
project(Begin)
Vz:
80°00’13"
HR:
340°56’50"
SD:
4.890m
HDist:
4.831
Meas T.H
Mode Enter
project(end)
Vz:
83°09’38"
HR:
24°30’08"
SD:
6.408m
HDist:
6.362
Meas T.H
Mode Enter
All manuals and user guides at all-guides.com