7
3 Assembly
Before starting the assembly, read the safety information in Section 2.
3.1 Check for Completeness
•
Carefully open the cardboard packaging.
•
In doing so, do not use any long knife blades. They may damage the components in-
side.
•
Check the parts supplied against the list in Section 1.4 Items supplied.
•
Check the contents for visible transit damage. In the event of any damage or incor-
rect components, contact customer services (see Section 6).
•
Do not attempt to assemble the workstation frame if there is any damage or if there
are any incorrect components.
3.2 Packaging & Disposal
•
Remove the packaging. Treat as household waste/paper.
•
Observe national legislation.
3.3 Tightening torques for screws used
Assemble the workstation frame with the tools supplied only.
Important!
The following is essential for a proper function:
•
Do not put the cap screw in slanted as this might damage the treat of the screw or
nut and results in failing to assemble the system properly.
Summary of Contents for STEELFORCE PRO 300 HC
Page 11: ...11 7 8 F 9 8 F Photo 8 Adjust the center tube to balance both end J Maximum Screw Torque 10N m...
Page 12: ...Important The set screws of the center tube must screw tighten 9 K 12...
Page 16: ...IMPORTANT 18 3 3 G 15 16 17 C F 5 3 4 7 Mounting the Handle L 19 16 Maximum Screw Torque 10N m...
Page 31: ...11 Abbildung 8 Richten Sie die Antriebswelle aus 7 8 F 9 8 F J Maximales Drehmoment 10N m...
Page 52: ...12 Belangrijk De stelschroeven van de middelste buis moeten vastgedraaid zijn 9 K...
Page 72: ...Important Les vis de r glage du tube central doivent tre viss es 9 K 12...