INSTALL COUNTERTOP
NOTE: IF YOU HAVE A SUITE FOR POWER BURNER OR KAMADO GRILL, SEE THE
APPENDIX AT THE BACK OF THIS MANUAL FOR DETAILS BEFORE INSTALLING
THE COUNTERTOP.
5. Install the countertop. Get assistance from another person to help lift the top and position
correctly. Install 1/4-20 x 1/2” long hex bolts and flat washers where needed. When
complete, apply a bead of clear silicone sealant along the joint indicated.
APPLY SEALANT
ALONG THIS JOINT
HOLE FOR
OPTIONAL BEER
DISPENSER
FOOTRAIL INSTALLATION
(FOR MODELS WITH BAR)
MOUNTING
SCREWS
SETSCREW
1. Install the footrail brackets on the rear wall
as shown using #10-24 x 1/2” long flat-head
mounting screws. Do not fully tighten the screws
yet. It might be easier to align the screws with a
helper on the other side of the wall.
Check to see if the setscrew in each bracket is
backed out enough to allow the tube to pass
through easily.
NOTE: For installation of the footrail, it is assumed the curb base of the entire suite was
installed on a flat and level concrete or masonry patio surface (see page 4). If the surface
is not level, the bottom pads of each bracket may
not rest fully on this surface. Also if you decide
to tile around the suite after installation, the
bottom pads of the footrail will still be on the same
level as the underside of the curb base. Your tile
installation will need to make allowances for this
condition.